WARRIOR FIELD ARTIFICIAL TURF

UNIVERSITY OF WATERLOO WATERLOO, ON

This project involved the construction of a new full-sized synthetic turf sportsfield for soccer/football. Project requirements included grading to design subgrades, sub-drain collector tiles and concrete perimeter curbing and slot drain. The base profile included free draining aggregate graded to FIFA planarity, overlying composite drain tiles on an impermeable membrane. Turf system – Duraspine Pro-1 CA. Associated site works included concrete paving, lighting and fencing. This project is certified FIFA I Star.

CLIENT

University of Waterloo

PROJECT COST

$ 1,878,490.00

DATE OF COMPLETION

2010
l have had the opportunity to work with Gateman Milloy on multiple FIFA 1-Star artificial turf field projects including the Packham Soccer Facility in Stratford, the University of Waterloo Warrior Field, and the Sheridan College Bruin’s Athletic Field. Their site staff is knowledgeable, experienced, and their ability to proactively anticipate site issues allowed the projects to be completed on time and on budget. All their work exhibits a high level of workmanship and staff takes pride in the quality of their trades. Their project management staff have strong organizational and communication skills and are always courteous and respectful to their staff, the Client, and the consulting team

Steve Benda. OALA, CSLA. Sport Group Leader - Eastern Canada. Stantec Consulting Ltd.