Completed in 2012, the Hershey Centre Sports Complex is located at 5725 Rose Cherry Place in Mississauga. This project included the supply and installation of an 8,200 square meter Air Supported Structure covering an existing artificial turf soccer field. Associated works included electrical and mechanical equipment, sportsfield equipment, sportsfield lighting and site electrical modifications, watermains, site grading, asphalt pathways, asphalt fire route reconstruction, concrete paving and landscape restoration.